2. Arrangement (done)

 

  • Green table arrangement (done)

  • LPKF machine workstation (done)

  • Objet 260 3D printer (done)

  • Small 3D printer (done)

  • Workstation setup (done)

  • My Workplace (done)

  • Keep improving :)

 

3. Vacuum cleaner (done)

 

  • Silence dry vacuum cleaner

  • Wet&dry vacuum cleaner

  • Vacuum bag

  • Vacuum accesories

  • problem with the reimburstment process :(

 

Here is the list for job planning to be done

 

To Do List is all about job carry on for workshop or laboratory. It can be anything from building related, machine related, tooling related or even software related. This job is not related to job list from user. It more to support, maintenance and development.

For now everything is on hold. Will update in future if available.

4. Ikea order (done)

 

  • Dust bin 

  • Chopping board

  • Ziplog bag

  • problem with the reimburstment process

1. Workshop cleaning (complete)

 

  • Clean moldy wall (done)

  • Clean cabinet and furniture (done)

  • Air-con split unit (done)

  • Air-con AHU (70%) Still unable to solve due to building control

  • Water jet washer (done)

  • LPKF machine (done)

  • Floor cleaning (done)

  • Full cleaning

5. Power tools (complete)

 

  • Bosch power drill

  • Dremel power drill

  • Accesories

  • problem with the reimburstment process

6. Fami Workstation order (complete)
  • Panel with hole (installation in progress)

  • Frame (installation in progress)

  • Tool holder(installation in progress)

  • Table (done)

  • http://www.fami.com.sg/

7. LPKF setup (complete)
  • 10042015

  • Machine cleaning(done)

  • Machine calibration and testing(done)

  • Tool and material ordering(pending with approval)

  • SOP(in progress)

  • data centra (in testing)

  • CAM editor software (in planing)

8. Objet printer deep cleaning (complete)
  • Clean roller

  • Blade cleaning(done)

  • Machine calibration and testing(done)

  • Material ordering(pending with approval)

  • SOP(in progress)

  • Computer management

  •  

9. Filament feeding (in progress)
  • Filament holder (in progress)

  • Filament feeder (in testing)

  • Machine relacate (in progress and testing)

  • Material ordering(in progress)

  •  

10. Computer and printer setup(done)
  • Workstation setup(in progress)

  • Printer setup (in progress)

  • Machine calibration and testing(done)

  • Material ordering(pending with approval)

  • SOP(in progress)

  • Computer management

  •  

11. Falcon X2 repairing (complete)
  • add on manual z-axis calibration

  • Fix wiring issue and glue the connection

  • Machine calibration and testing(done)

  • start gcode and end gcode editing and testing (done)

  • 20160928- machine breakdown with broken position sensor

12. Data management (done)
  • google drive setup (done)

  • NTU network setup and testing (done)

  • SSD and HDD installation (done)

  • Backup system (cancel)

  • Using google drive and backup google drive

13. Additional tooling panel (done)
  • Making braket

  • Mouting without drilling hole to the wall @.@

  •  

14. Component (pending)
  • Searching for E component

  • Searching for wire

15. CCTV (complete)
  • Camera installation (done)

  • Networking setup for CCTV (done)

  • Recording and playback testing(done)

  • Detection setting and event setting (done)

  • 20160808 install USB fan for cooling

16. Equipment repair (cancel)
17. Rework station (complete)
  • Setup soldering and desoldering station (done)

  • Testing and program auto shutdown (done)

  • Preheater and tweezer soldering setup (done)

  • Support basic SMD rework function (done)

21. Fume auto system (on hold)
  • Actuator with electrical control (testing)

  • Timer for auto shut off actuator (in progress)

  • Link application for actuator control (in progress)

  • Fume arm 3d print or buy :) (in progress)

19. 3D printer production mode (complete)
  • Setup 3D printer on shelving soldering (done)

  • Printer calibration and testing (done)

  • Shelving support (pending)

18. Shelving system (complete)
  • Setup and install shelving system (done)

  • Packing and organize stuff (done)

20. System backup and standby mode(complete)
  • Setup all system with cloud share file (done)

  • Backup each system with backup clone drive (done)

  • using free clone software :)

23. LPKF upgrade (cancel)
  • Laptop to workstation

  • Precision depth calibration

  • Developed special tool for calibration work.

  • Design fixture for machine calibration and service

22. exhaust auto system (cancel)
  • Connecting host to connex (in progress)

  • Connected to LPKF vacuum (in progress)

  • Actuator with electrical control (testing)

  • Timer for auto shut off actuator (in progress)

  • Link application for actuator control(in progress)

24. All other planing (cancel)